DMACC Dental
Posted by

Cunningham, Inc. was proud to contribute to the construction of the new DMACC Dental Building on the Ankeny campus. This approximately 29,500 square-foot facility was designed to expand DMACC’s Dental Hygiene and Dental Assisting programs, providing modern classrooms, advanced clinical training spaces, dental operatories, and specialized learning environments. The new facility will create expanded opportunities…

Altoona Fire Station No. 26
Posted by

The construction of Altoona Fire Station No. 26 provides the Altoona Fire Department with a new satellite facility designed to support emergency response operations and the daily needs of its firefighters and emergency personnel. Approximately 18,000-square-foot facility includes four drive-through apparatus bays, administrative offices, training and emergency operations space, sleeping quarters, fitness and locker facilities,…

Pella Aquatic Center
Posted by

Cunningham, Inc. was proud to contribute to the Pella Aquatic Center in Pella, Iowa,providing a combination of pool mechanical systems, plumbing, and HVAC services. Theproject consisted of two separate phases, including the original aquatic center and thelater addition of the Adventure River. Cunningham completed the majority of the poolpiping throughout the aquatic center, along with…

New Central Library
Posted by

This project presented challenges right from the beginning. The heart of the HVAC system consists of 3 large Custom Air Handling Units that are installed in two mechanical rooms below grade. These units weighed a total of 128,520 lbs and came in 10 sections. AHU #1 (the largest of the three) weighs 71,000 lbs alone,…

Iowa Speedway
Posted by

Iowa Speedway. Each of these areas was like working on a separate project. They each have their own rooftop units (32 total), duct system and control system. Also, each one even has its own door to outside the building and no connecting doors between. Coordination and efficiency were at the forefront; with so many trades…

Des Moines Municipal Service Center
Posted by

Cunningham, Inc. provided a total mechanical system at the new Des Moines Municipal Service Center over a period of 18 months. This project had a variety of equipment to be implemented throughout the 88,000 sq. ft. building, which had to work together to provide a LEED Certified end-product. The center has a Variable Refrigerant Flow…